What a factory actually charges for, why the first quote is often the cheapest and the slowest, and how to read three numbers before you compare suppliers.
MOQ, tooling and lead time are quoted independently but they are one system. A low MOQ usually means a shared die and a longer queue; a high tooling charge usually buys a dedicated die and a shorter one.
| Item | Typical range | Lead time | Notes |
|---|---|---|---|
| Extrusion die | USD 350–900 | 7–12 days | Amortized on repeat orders |
| Mandrel set | USD 150–400 | 5–10 days | Per ID in the family |
| Compression mould | USD 1,200–4,500 | 15–25 days | Driven by cavitation |
| Trial + report | USD 120–300 | 2–4 days | Ask for the dimensional sheet |
For stock sizes, MOQ is often one carton and the constraint is shipping, not production. For a custom compound the real floor is the minimum batch the mixer will run — usually 20–25 kg, which on a 6 mm tube is several hundred metres.
Both are silicone rubber, and on a drawing they look identical. The cure system decides what leaches out of the …
28 Oct 2026 · 7 min read
ID, wall and concentricity are three separate promises. Confusing them is the most common reason a tube that &ld…
21 Oct 2026 · 8 min read
Three names that get used interchangeably in quotation emails, and three completely different tests. Here is wha…
14 Oct 2026 · 9 min read
Send a drawing or a sample. We will tell you which compound and hardness we would run, and what it costs at your volume.